4. Installation
Our team of experienced technicians installs the solar system and data logger so it can be monitored for performance and […]
Our team of experienced technicians installs the solar system and data logger so it can be monitored for performance and […]
The solar array is designed based on the electrical requirements of the school, clinic or home and the materials are
Based on the results of the community surveys project sites are selected with an emphasis onmaximizing the impact of our
Commissioning of the plant covers the complete installation of PV Modules with inverter and the system is further connected to
Beneficiary population: 30,000+ 5kw solar array installed Bahraich District, Uttar Pradesh Previous Next
Beneficiary population: 50,000+ 5kw solar array installed Bahraich District, Uttar Pradesh Previous Next
Beneficiary population: 50,000+ 5kw solar array installed Bahraich District, Uttar Pradesh Previous Next
Beneficiary population: 50,000 5kw solar array installed Bahraich District, Uttar Pradesh Previous Next
Beneficiary population: 50,000+ 3kw solar array installed Kheri District, Uttar Pradesh Previous Next
Beneficiary population: 5,000+ 3kw solar array installed Bahraich District, Uttar Pradesh Previous Next